Which big projects have you completed?
Which big projects have you completed?

Answer:We completed big projects such as Brazilian Olympic Games 2016, Beijing Olympic Games 2008, Copa America, Korean Formula 1, Singapore Formula 1, Southeast Asian Games, Africa Cup, Beach handball world championships, University games, suffused with the Copa America.

Detail +
  • Which big projects have you completed?

    Answer:We completed big projects such as Brazilian Olympic Games 2016, Beijing Olympic Games 2008, Copa America, Korean Formula 1, Singapore Formula 1, Southeast Asian Games, Africa Cup, Beach handball world championships, University games, suffused with the Copa America.

  • Avant Service

    Service & Guarantee: Thoughtful Project Service 1. Professional and free design solution before sales. 2.High quality products finished and shipped on time. 3.Complete and free after sales service.

  • Anly metal bleachers

    Anly metal bleachers

  • Aneasy temporary bleacher

    Aneasy temporary bleacher.rar

  • Installations

    Avant telescopic seating systems provides different installation patterns based on different site conditions and requirements .It adopts modular production and easy to deliver and install.

  • How long is the lead time?

    Answer:Normally our production period is about 40-45 days. In the case of client special request, we will speed up the production progress against the project time table provided before production.

  • If I need an offer, what information do you want?

    Answer:If clients want to know the price of certain fixed seat, please give us the DWG drawing, pictures (if it is possible), progress of construction sites. We will estimate whether our seats satisfy with the concrete steps according to our seat’ dimension and the international safety requirements of fire exits.

  • Do you deliver the installed system or only the pa...

    Answer:Generally speaking, we deliver the parts. If the client ask us deliver the installed system, it is OK. But the system dimension will be strict in accordance with the container volume, and it will increase largely on the freight cost

  • How long of the delivery time?

    Answer:For different countries and regions, the delivery time is different. Normally, for Southeast area, delivery time is 10-15 days; Middle east is15-18 days;

  • What is the quick assembly stand?

    Answer:Rapid assembly stands is a new type of temporary stands system, which can be used in any combination. The frame body unit adopts the structure of the chrysanthemum scaffold structure, which is composed of 48 types of the structure of the types of chrysa...